Maintenance of tanks (Wastewater treatment system, CAMIX company _Vietnam )
![]()
PUMP PIT
| Technology maintenance: | ||
| ■ | Take out rubbish & suck out sludge periodically. | |
| ■ | Washing & cleaning. | |
| Construction maintenance: | ||
| ■ | Check the wall of deep well, cement fill, consolidation or repair if necessary. | |
| Mechanical structure maintenance: |
| ■ | Check the screen basket, screen plate for deformation, broken… adjust or repair if necessary. |
| ■ | Check the guiding column, pooling chain for looseness, corrosion, deformation…adjust or repair if necessary. |
| Electricity & automation maintenance: | ![]() |
||
| ■ | Check the power/signal cable/wire for scratch, looseness… repair, tighten if necessary. | ||
| ■ | Check the water level contactor for dirtiness, corrosion, broken… clean, repair or replace if necessary. | ||
![]() |
EQUALIZATION TANK
|
||
| Technology maintenance: | |||
| ■ |
Take out rubbish & suck out sludge periodically. | ||
| ■ |
Washing & cleaning. | ||
| Construction maintenance: | |||
| ■ | Check the wall of deep well, cement fill, consolidation or repair if necessary. | ||
Mechanical structure maintenance:
■ Check the guiding column, pooling chain for looseness, corrosion, deformation…adjust or repair if necessary.
| AERATION TANK
|
![]() |
||
| Technology maintenance: | |||
| ■ |
Take out rubbish, dead biomass floating on the surface. | ||
| ■ |
Filtering the biological sludge & whole cleaning yearly. | ||
| ■ |
Measure the concentration of biological sludge, reduce or add more if necessary. | ||
| ■ |
Check the working status of biological sludge via: colour, sedimentation speed, flocculation… & adjust for suitability. | ||
| ■ | Check the air diffuser disc for broken, obstruction… repair or replace if necessary. | ||
Construction maintenance:
| ■ | Check the wall of tank, cement fill, consolidation or repair if necessary. |
Mechanical structure maintenance:
| ■ | Check the air distribution pipe at the bottom of the tank for looseness, deformation… adjust, repair if necessary. |
Electricity & automation maintenance:
| ■ | Check the power/signal cable/wire for scratch, looseness… repair, tighten if necessary. |
| ■ | Check the DO contactor for dirtiness, corrosion, broken… clean, repair or replace if necessary. |
![]() |
SEDIMENTATION TANK
|
||
| Technology maintenance: | |||
| ■ |
Take out rubbish, dead biomass floating on the surface. | ||
| ■ | Cleaning the inlet distribution pipe & collection gutter. | ||
Construction maintenance:
| ■ | Check the wall of tank, cement fill, consolidation or repair if necessary. |
Mechanical structure maintenance:
| ■ | Check the inlet distribution pipe for looseness, deformation, broken… adjust, repair if necessary. |
| ■ | Check the V-shape gutter for leveling, adjust, repair or replace if necessary. |
| ■ | Check the propeller for looseness, deformation, broken…adjust, repair if necessary. |
Electricity & automation maintenance:
| ■ | Check the power/signal cable/wire for scratch, looseness… repair, tighten if necessary. |
| ■ | Check the DO contactor for dirtiness, corrosion, broken… clean, repair or replace if necessary. |
![]() |
DISINFECTION TANK
|
||
| Technology maintenance: | |||
| ■ | Check the baffle plate for looseness, deformation… adjust, tighten or repair, replace if necessary. | ||
| ■ | Measure the concentration of chlorine, adjust for suitability. | ||
| ■ | Take a sample, analyze and compare with wastewater discharge standard. | ||
Construction maintenance:
■ Check the wall of tank, cement fill, consolidation or repair if necessary.
Electricity & automation maintenance:
■ Check the power/signal cable/wire for scratch, looseness… repair, tighten if necessary.
■ Check the chlorine contactor for dirtiness, corrosion, broken… clean, repair or replace if necessary.
You can see this video for more informations.