Maintenance of Electrical & Automation Parts (WWTP_Proffesional Contractor Vietnam)
![]()
ELECTRICAL PANEL
| Hardware maintenance: | ||
| ■ |
Cleaning inside & outside of ele.panel by using air compressor & vacuum cleaner. |
|
| ■ |
Check the working status of voltage gauge, current gauge – repair or replace if necessary. |
|
| ■ | Check the contact switches, signal lamp – repair or replace if necessary. | |
| ■ | Check the working status of general CB & single CB - repair or replace if necessary. | |
■ Check the contact points for corrosion, loosen or broken – cleaning, tightening or re-connecting if necessary.
![]() |
AUTOMATION WITH PLC
|
||
| Software maintenance (PLC): | |||
| ■ | Cleaning PLC, ele.component by using air compressor, vacuum cleaner. | ||
| ■ | Check the fault history recorded by PLC (if any), find out the reason & overcoming solution. | ||
| ■ | Check all the setted data & measured figures, write down to the maintenance book. | ||
| ■ | Reseting the working data (if necessary) for corresponding to a current working situation of the system. | ||
■ Reseting up the automation program if the old one is lost or wrong…
■ Make a test for sure that the PLC & automation program still work well.
■ Check the contact points of communication ports (I/O) – cleaning, tightening if necessary.
![]() |
ELECTRIC WIRE & CABLE
|
||
| Ele.wires & cable maintenance: | |||
| ■ | Check the power/signal cable/wire for scratch, looseness… repair, tighten if necessary. | ||
| ■ | Check the contact points of connection boxes for corrosion, loosen – cleaning & tightening if necessary. | ||
| ■ | Check for the firmness, well balance of cable ladder, supports of cable ladder – adjust or repair if necessary. | ||
| ■ | Cleaning electric wires/cables, cable ladder – repair, repaint if necessary. | ||
You can see this video for reference. If you want to see more videos, you can go to Camix's Videos Channel.










